Industrialised Construction Awards
20 April 2027
AWARD ENTRIES FOR 2027 OPENING SOON!
Register your interest by dropping an email to ellie.guest@radar-media.co.uk
Co-located with the Industrialised Construction Conference
The Industrialised Construction Awards celebrate the innovation, leadership, and collaboration driving the transformation of the UK and Ireland built environment through digitalisation, productisation, and manufacturing-led delivery.
If you are interested in judging, email ellie.guest@radar-media.co.uk with your name, job title, company and a short biography explaining why you would make a good judge!

Awards partners


Award Categories
Entry System opens 01 December 2026!
Register your interest by dropping an email to ellie.guest@radar-media.co.uk
Recognises outstanding implementation of digital technologies such as BIM, digital twins, product libraries, and data interoperability that have demonstrably improved productivity, coordination, and lifecycle performance.
Typical examples: Digital twin-enabled projects; integration of design-to-manufacture workflows; open BIM adoption.
Entrant Questions:
- What digital technologies did you implement (e.g., BIM, digital twins, product libraries), and why were they chosen for this project or programme?
- How did your digital workflows improve productivity, coordination, or lifecycle performance? Please include measurable outcomes where possible.
- In what ways did you support data interoperability and open standards across the project team or supply chain?
- How did your digital tools enable design-to-manufacture integration and improve productivity?
- What evidence can you provide demonstrating the scalability or replicability of your digital approach on future projects?
Celebrates leadership in developing or deploying standardised, repeatable building systems or components that can be applied across multiple sectors.
Typical examples: Platform-based housing systems, standardised bathroom pods or MEP assemblies, reusable façade systems.
Entrant Questions:
- Describe the standardised or repeatable system(s) you developed or deployed and the problem(s) they were designed to solve.
- How did your solution demonstrate platform thinking or reusability across multiple sectors or building types?
- What measurable benefits were achieved (e.g. reduced design time, cost predictability, quality improvements)?
- How did you ensure compliance with regulations and performance standards across the platform?
- What evidence demonstrates the long-term scalability or future potential of your productised system?
Recognises excellence in offsite manufacturing, automation, factory simulation, and quality assurance that improves scalability and consistency.
Typical examples: Modular or component factories demonstrating lean principles, robotics, and traceable production data.
Entrant Questions:
- Describe the manufacturing methods, automation, or quality systems you implemented in your factory environment.
- How did these methods improve scalability, productivity, consistency, or traceability? Please include supporting data.
- What lean manufacturing or continuous improvement principles were adopted, and how were they embedded?
- How did digital tools (e.g., factory simulation, production data, robotics integration) enhance performance?
- What steps have you taken to future-proof your manufacturing capability or expand your industrialised output?
Acknowledges clients or project teams that have pioneered outcome-based procurement models and long-term frameworks enabling industrialised delivery.
Typical examples: Aggregated demand frameworks, type-approved systems in public programmes, or early supplier engagement initiatives.
Entrant Questions:
- Describe the procurement model, framework, or commercial approach you implemented and its intended outcomes.
- How did your approach enable industrialised delivery, early engagement, or aggregated demand?
- What measurable improvements resulted (e.g., cost certainty, programme reduction, supplier continuity)?
- How were risk, value, and long-term collaboration managed differently compared to traditional procurement?
- What lessons or templates from your model could be replicated across the wider sector?
Honours projects or systems that embed low-carbon design, circular economy principles, and lifecycle traceability in industrialised construction.
Typical examples: Projects achieving significant embodied carbon reductions or demonstrating closed-loop materials reuse.
Entrant Questions
- What low-carbon, circular economy, or resource-efficiency strategies were embedded in your industrialised solution?
- Provide evidence of measurable carbon, waste, or lifecycle performance improvements.
- How did digital tools support lifecycle traceability, material passports, or closed-loop processes?
- How were materials or components designed for reuse, recovery, or disassembly?
- What is the long-term sustainability impact or legacy potential of your approach?
Recognises innovative integration of multiple offsite technologies – volumetric, panelised, and component-based – in a single project.
Typical examples: Mixed system approaches for high-rise residential, hospitals, or schools integrating multiple manufacturing partners.
Entrant Questions
- Describe the types/mix of offsite technologies used (e.g. volumetric, panelised, components) and how a solution was selected?
- How were manufacturing partners or systems coordinated to ensure performance and compatibility?
- What were the key technical, logistical, or integration challenges and how were they overcome?
- What measurable benefits were achieved through the systems and technologies? (e.g. speed, quality, flexibility)?
- How does this project demonstrate a replicable model for industrialised delivery in the UK?
Highlights organisations building capacity through training, reskilling, and multidisciplinary collaboration across design, manufacturing, and assembly.
Typical examples: Partnerships with CITB or universities; factory apprenticeship schemes; upskilling for digital and manufacturing competencies.
Entrant Questions
- What training, reskilling, or workforce development programmes did you implement, and who were they designed for?
- How did your initiative improve capability in digital, manufacturing, or assembly skills?
- What partnerships were established (e.g. CITB, universities, colleges, factory apprenticeship schemes), and how did they add value?
- What measurable outcomes were achieved (e.g. number of people trained, productivity improvements, retention rates)?
- How will your workforce development model scale or support long-term sector transformation?
Recognises clients or developers demonstrating vision and leadership in commissioning and scaling industrialised construction.
Typical examples: Public-sector frameworks (e.g., Homes England, NHS, DfE, MoJ, DIO) or private developers with repeatable MMC portfolios.
Entrant Questions
- Describe the leadership vision or strategy behind your adoption of industrialised construction.
- How did you establish repeatable or scalable demand (e.g., frameworks, portfolios, long-term programmes)?
- What decisions did you make early in the process that enabled industrialised delivery and supplier collaboration?
- What measurable performance improvements resulted from your approach?
- How has your leadership influenced broader organisational or sector transformation?
Celebrates the most effective cross-sector collaboration between clients, designers, manufacturers, and contractors that exemplifies the “industrialised by design” ethos.
Typical examples: Consortia delivering integrated modular programmes, design–manufacture partnerships, or shared data environments.
Entrant Questions
- Describe the collaboration model used across client, designer, manufacturer, and contractor teams.
- How did you align digital platforms, data environments, and design-manufacture workflows across organisations?
- What major challenges were solved through collaboration, and how were decisions made collectively?
- What measurable improvements were achieved due to the collaborative approach?
- How does the project embody the “industrialised by design” ethos, and what can others learn from it?
A special recognition for individuals or organisations that have made an exceptional contribution to advancing industrialised construction in the UK.
Typical examples: Advocacy for ICAB initiatives, development of national standards, or long-term leadership in offsite innovation.
Entrant Questions
- Summarise the nominee’s long-term contribution to the advancement of industrialised construction in the UK.
- What specific initiatives, innovations, or leadership actions demonstrate their pioneering role?
- How has their work influenced national standards, policy, industry adoption, or the ICAB’s mission?
- What evidence demonstrates measurable sector impact over time?
- Why is their contribution considered exceptional compared to typical industry leadership or innovation?
Recognises an outstanding multidisciplinary team that has demonstrated exceptional leadership, integration and collective performance in the successful delivery or advancement of industrialised construction. The award celebrates teams that break down traditional organisational boundaries and create a high-performing culture focused on shared outcomes, innovation and continuous improvement.
Typical examples: Integrated client, design, manufacturing and construction teams; project delivery teams achieving exceptional industrialised outcomes; cross-functional internal teams driving organisational transformation; programme teams successfully scaling industrialised construction across multiple projects.
Entrant Questions:
- Describe the team, its purpose and the roles of the key individuals or organisations involved. How was the team structured to support industrialised construction delivery?
- How did the team establish a shared culture, objectives and ways of working across different disciplines, organisations or stages of the design-manufacture-assembly process?
- What significant challenges did the team encounter, and how did collective problem-solving, leadership or collaboration enable these to be overcome?
- What measurable outcomes did the team achieve? Please provide evidence where possible relating to areas such as productivity, programme, cost, quality, safety, sustainability, predictability or customer satisfaction.
- What distinguishes this team from conventional project or organisational teams, and what lessons from its approach could be replicated to improve industrialised construction delivery elsewhere?
Recognises an exceptional individual at an early stage of their career who is already making a significant contribution to the advancement of industrialised construction. The award celebrates emerging talent demonstrating innovation, leadership, technical capability and the potential to become one of the future leaders of the sector.
Typical examples: Early-career designers, engineers, digital specialists, manufacturing professionals, project managers, researchers, apprentices or graduates championing new approaches to design, manufacture, assembly, data, automation or industrialised delivery.
Entrant Questions:
- Describe the nominee’s current role, career journey and involvement in industrialised construction. What has distinguished their contribution at this stage of their career?
- What specific projects, innovations, initiatives or improvements has the nominee personally influenced or delivered?
- How has the nominee demonstrated initiative, leadership, technical excellence or a willingness to challenge conventional construction approaches?
- What measurable impact has their contribution had on their organisation, project or wider industry? Please include evidence of improvements in areas such as productivity, quality, digitalisation, sustainability, collaboration, safety or skills.
- Why should the nominee be considered a future leader of industrialised construction, and how are they helping to influence or inspire others within the sector?
Recognises outstanding application of Design for Manufacture and Assembly (DfMA) principles to create building systems, products or projects that are simpler, safer, more efficient and more predictable to manufacture and assemble. The award celebrates design approaches that actively optimise the relationship between design, manufacturing, logistics and site assembly from the earliest project stages.
Typical examples: Projects designed around manufacturing constraints and assembly sequencing; rationalised component families; reduced component counts; standardised interfaces; kit-of-parts solutions; manufacturing-led structural or MEP design; digitally enabled design-to-production workflows.
Entrant Questions:
- Describe how DfMA principles were embedded within the design process and how manufacturing, logistics and assembly requirements influenced key design decisions from an early stage.
- How did the design simplify or optimise manufacture and assembly? Please consider areas such as standardisation, component reduction, repeatability, interfaces, tolerances, connections, access, sequencing or elimination of unnecessary site operations.
- How were designers, manufacturers, contractors, installers and other key supply-chain partners integrated into the DfMA process, and what tools or digital workflows supported this collaboration?
- What measurable benefits were achieved through the DfMA approach? Please provide evidence relating to productivity, programme, labour requirements, waste, quality, safety, cost certainty or manufacturing efficiency.
- How transferable or scalable is the DfMA methodology, and what lessons from the project or system could help drive wider adoption of manufacturing-led design across the construction sector?
Recognises a project, programme, organisation or industrialised solution that has delivered a demonstrable step-change in construction productivity and performance. The award celebrates evidence-led approaches that achieve more with fewer resources through standardisation, manufacturing, digitalisation, automation, improved workflows or smarter delivery models.
Typical examples: Programmes demonstrating significant reductions in labour hours or construction duration; measurable improvements in output per worker; standardised delivery models improving cost and programme certainty; data-led productivity initiatives; industrialised solutions substantially reducing rework, waste or site activity.
Entrant Questions:
- What productivity or performance challenge were you seeking to address, and what baseline or benchmark was established against which improvement could be measured?
- Describe the industrialised methods, technologies, processes or delivery models introduced to improve productivity and performance. Why were these approaches selected?
- What measurable improvements were achieved? Please provide quantitative evidence wherever possible relating to metrics such as output per worker, labour hours, programme duration, cost, predictability, utilisation, rework, waste, quality or safety.
- How were performance data collected, monitored and used to drive continuous improvement throughout the project, programme or organisation?
- How can the productivity gains demonstrated be sustained, replicated or scaled across future projects, programmes or the wider construction sector?
Recognises outstanding planning and execution of the logistics, installation and assembly phase of industrialised construction. The award celebrates approaches that successfully translate factory-manufactured products and systems into high-quality completed buildings through exceptional coordination, sequencing, logistics, installation quality and site integration.
Typical examples: Complex modular installation programmes; panelised or structural system erection; just-in-time delivery strategies; digitally planned assembly sequences; constrained urban logistics; large-scale component installation; innovative lifting or handling strategies; site assembly programmes demonstrating exceptional safety, quality and productivity.
Entrant Questions:
- Describe the industrialised systems, products or components being delivered and assembled, and explain the principal logistics and installation challenges presented by the project.
- How was the logistics and assembly strategy developed and coordinated across manufacturing, transportation, delivery, lifting, installation and follow-on trades?
- What innovative methods, digital tools, sequencing strategies or installation techniques were used to improve safety, efficiency, quality or predictability on site?
- What measurable benefits were achieved through the installation and logistics approach? Please provide evidence relating to programme, labour productivity, delivery reliability, site movements, safety, defects, rework, waste or quality.
- How did the project ensure that factory-controlled quality and designed performance were maintained through transportation and installation into the completed building, and what lessons could be replicated on future industrialised projects?

